Poststrasse 17, Biel

As part of the project, 37 flats with a total area of 3506 m² were completely refurbished, including the removal of pollutants. The façade and the car park were not affected by the work. The building services, including the cold and hot water pipes, were completely renovated. The heating system was also prepared for subsequent connection to the district heating system.

During the entire renovation phase, it had to be ensured that the businesses (Denner, pharmacy and hairdresser) could continue their daily operations without major disruption. The structural adaptation for earthquake protection posed a particular challenge. The flats were refurbished in their previously vacant state.

Translated with www.DeepL.com/Translator (free version)

Purpose
Residential, retail, commercial
Architecture

Kretz Architektur

Builder

Pensionskasse Kaminfeger

Completion

Halter AG, Renovations

Development

Halter AG, Renovations

Area

Plot 1904 sq.m, gross floor area 6534 sq.m, building volume 19,932 m³

Investment volume

CHF 7,63 million

Construction period

March 2024 – November 2024

Services

Total contractor